04040C 322A1F 653B09 817E79 A47446 ADACB1 AF9876 CFD5E3

Painting our bedroom - construction

Posted by
Aaron S (Auckland, New Zealand) on 20 January 2009 in Miscellaneous.

1st photo : All wallpaper is stripped off, getting ready to plaster, sand and fill in gaps.
2nd photo : Oil-based sealant is up on the walls, gaps are done.
3rd photo : Trims have been started, bathroom walls have 1st coat.

Stay tuned tomorrow for the final result.

Canon EOS 20D 1/25 second F/4.0 ISO 800 17 mm